<table id="bxsrk"><option id="bxsrk"><b id="bxsrk"></b></option></table>
    1. <td id="bxsrk"></td>

      < project | Previous project >

      Nepal: Design and Construction Supervision of Melamchi Headworks and Diversion Tunnel

      Eptisa will provide project management assistance, including design review and construction supervision, for the Melamchi Diversion Scheme Construction. This project aims to divert 510 MLD raw water from the Melamchi Valley to the Kathmandu Valley through a 26.1 km tunnel, the construction of 43 km of access roads and the upgrade of 29 km of roads for the construction and maintenance of facilities, as well as the construction of a water treatment plant with an initial capacity of 170 MLD.
      韩国婬乱一级毛片无码观看_欧美丰满熟妇BBB久久久_九九热视频在线观看_精品一区二区三区在线免

      <table id="bxsrk"><option id="bxsrk"><b id="bxsrk"></b></option></table>
      1. <td id="bxsrk"></td>